Touchstone Exploration's PS-623 well starts production at initial rate of 387 barrels a day
Bitget2026/10/29 07:13- Touchstone Exploration reported gross CR-3 natural gas test rates of approximately 5,000 and 6,800 Mcf/d during extended testing in October 2026.
- PS-623 began producing at an estimated initial rate of 387 barrels of oil daily, with a 1% water cut.
- Third-quarter sales averaged 4,485 barrels of oil equivalent daily, including 19,354 Mcf/d of natural gas.
- Cascadura compressor availability reached approximately 98% in September, supporting average gross natural gas production of 13,000 Mcf/d.
- Three Cascadura optimization workovers are planned before year-end; the drilling contractor will cover turnkey drilling costs for the second WD-4 well.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
Bank of Japan minutes turn hawkish: Most members believe a rate hike is needed soon, with a 70% probability of a hike in December
Minutes from the Bank of Japan show that several members believe a rate hike is needed in the near term, with a roughly 70% probability of an increase in December. Core inflation has met the target for the first time in 30 years, and the current policy rate stands at 1.25%.

Former Chainlink Product Marketing Director Michael Robinson joins Monad Foundation
The Federal Reserve Eyes $1.8 Trillion in “Shadow Credit”: Dallas and New York Fed Launch First Private Credit Survey
The Dallas and New York Federal Reserves have launched an investigation into private credit lending standards, covering an industry worth 1.8 trillions USD, with a minimum threshold of 50 millions USD. The results will be released in the first quarter of 2027.

Tom Lee Says a VIX Signal Points to a Stock Market Bottom
